Multifix 125

SUREFOOT CONCRETE FREE FOOTINGS

Multifix 125

Micro Piles: 4 x 25NB (Nominal Bore) 33.7OD
Galvanised Pipe Light, Medium, Heavy

Load Capacity: Up to 40kN

Average installation time: 10 minutes approx.

Category:
construction 17 yb 14

READY TO WORK TOGETHER? BUILD A PROJECT WITH US.

fencing 825x510 1 2

SUREFOOT CONCRETE FREE FOOTINGS

FENCING FOOTING

Regardless of the fencing material chosen, without the correct footing in place the overall integrity of the fence is compromised. Inadequate footings will lead to fence leaning over time impacting both the aesthetics and functionality of the fence.

The Surefoot Footing is a stabilising infrastructure that can be used in any penetrable soil, including silts, clays, small gravels and even rock. A multi-purpose footing, the Surefoot system is an innovative alternative in all construction applications where a concrete footing can be used.

construction 17 yb 14

READY TO WORK TOGETHER? BUILD A PROJECT WITH US.

Screenshot 2023 07 25 at 9.12.49 AM

SUREFOOT CONCRETE FREE FOOTINGS

DECKING WITH SUREFOOT

Manufactured to support a varied selection of deck sizes, the Multifix-125 will install quickly and cleanly and is both cost effective and efficient. Ideal for residential decks it is also used for larger decking projects such as those found at mining camps and accommodation structures.

With an average installation of 10 minutes (depending on the project size) protect the construction of small extension projects with Surefoot concrete free footings.