SUREFOOT PILE CAP S250 4W
READY TO WORK TOGETHER? BUILD A PROJECT WITH US.
SUREFOOT CONCRETE FREE FOOTINGS
GENERAL INFO
It can hold up to 75 kN and has an average installation time of 10-15 minutes. Surefoot provides instant bearing capacity and can be built on once all micro piles have been installed and the pile cap bedded down.
It significantly reduces labour time, ensuring heightened profit margins. High strength and coating mass, the S 250-4 model is generally used for residential projects. Ideal for construction sites
with limited access it can be used in all soil types and perfect to use in remote and difficult access building sites. Surefoot footings can be fully recyclable, as the pile cap has the potential for re use.
SUREFOOT CONCRETE FREE FOOTINGS
FROM CONCEPT TO CONCRETE SLAB
Effectively negotiating the impact of reactive soil issues when building homes, the concrete slab is suspended allowing the soil to move beneath without pressure to the slab.
READY TO WORK TOGETHER? BUILD A PROJECT WITH US.
SUREFOOT CONCRETE FREE FOOTINGS
CYCLONE TIEDOWNS
Providing optimal stability and minimal soil and substrate disruption, they are the footing of choice for cyclone tie downs. Tested and certified in cyclonic prone areas, ensure your building project is optimally protected and built to withstand uplift, shear and environmentally challenging conditions. The Surefoot can be installed in all wind categories.