SUREFOOT PILE CAP S400 12P
READY TO WORK TOGETHER? BUILD A PROJECT WITH US.
SUREFOOT CONCRETE FREE FOOTINGS
GENERAL INFO
It can accommodate up to 200kN of gravity load and has an average installation time of 35 – 45 minutes. With untapped potential within many industries including the military, this innovative, reliable footing system will continue to revolutionise the way the construction industry operates
SUREFOOT CONCRETE FREE FOOTINGS
THE SOLAR INDUSTRY
Boasting an installation time of 15 minutes, the Pile Cap S400 has been crafted and designed to accommodate site specific foundation and soil types across a variety of geographical and climatic ranges particularly in remote areas where solar farms are commonly located. A multi-purpose foundation the Surefoot system is an innovative alternative in all construction applications where a concrete footing can be used.
READY TO WORK TOGETHER? BUILD A PROJECT WITH US.
SUREFOOT CONCRETE FREE FOOTINGS
CONTAINER & CYCLONE TIEDOWNS
Offering enhanced stability and minimal soil and substrate disruption, the Surefoot is the footing of choice for both container and cyclone tie downs. Both tested and certified in cyclonic prone areas, the Surefoot will ensure your building project is built and fastened to withstand uplift, shear and environmentally challenging conditions.